Changes between Version 14 and Version 15 of Sprint200912TriangleNC
- Timestamp:
- Nov 30, 2009, 2:55:38 PM (15 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Sprint200912TriangleNC
v14 v15 3 3 We'll be holding a Django development sprint at [http://www.carrborocoworking.com/ Carrboro Creative Coworking], 205 Lloyd St, Carrboro, NC 27510 ([http://maps.google.com/maps?q=205+Lloyd+St,+Carrboro,+NC+27510&oe=utf-8&client=firefox-a&ie=UTF8&hq=&hnear=205+Lloyd+St,+Carrboro,+Orange,+North+Carolina+27510&gl=us&ei=oqoSS47BH-PJlQfPotj7Cg&ved=0CAgQ8gEwAA&z=16 map]) on December 12th and 13th, 2009. 4 4 5 We'll be there at 9am both days to open the doors. It's a tradition go out for drinks after the sprinting winds down, perhaps around 4 or 5, but this may be later if development is going strong.5 We'll be there at 9am both days to open the doors. It's a tradition to go out for drinks after the sprinting winds down, perhaps around 4 or 5, but this may be earlier or later depending on the general momentum of the sprint. 6 6 7 7 This will be a general sprint focused on getting features ready for the 1.2 release. It doesn't require any previous experience and, if you don't have prior experience [http://docs.djangoproject.com/en/dev/internals/contributing/ contributing to Django], it is the perfect opportunity to start.